News

A new residential and commercial building with underground parking is being built in the center of Potsdam. Foundations and sheet pile walls are being installed by a consortium. For the drainage of the entire excavation pit, a total of 9 electric vacuum units from HÜDIG (type HC 488/25) were installed by the well construction company Wils & Water GmbH from Werder. For space reasons, ...

In recent years, irrigation machines have been a product in demand in agriculture due to the persistently low rainfall. Even farms with ...

HÜDIG sewage pump units of the types EVA 180 + EVA 350 now also available as "Whisper".

When designing a pipe network, various parameters must be taken into account. First of all, the ...